• COMPLIANT

    Egress distance verified

    Travel path ≤ 200' per IBC §1017

    WARNING

    Glass in rated corridor

    1-hr corridor, unrated glazing (IBC 2021 §1020)

    NON-COMPLIANT

    Structural beam blocks MEP riser

    S-302 beam lands in M-402 duct shaft

    COMPLIANT

    Shaft size coordinated

    M-201 duct riser fits A-402 shaft on all levels


    WARNING

    MEP clash at feature stair

    M-402 riser hits S-501 brace at A-310

    NON-COMPLIANT

    Sprinkler zoning conflicts ceiling plan

    FP-101 zones mismatch ID-501 RCP

Workflow

One platform for all documentation

SUBMITTAL REVIEW

QC CHECK

SUBMITTAL REVIEW

Manually, this takes 4+ hours. Datum does it in 15 minutes.

Side-by-side comparison with original PDF

Exact paragraph and line-item citations

Automated audit log for every decision

SUBMITTAL REVIEW

QC CHECK

SUBMITTAL REVIEW

Manually, this takes 4+ hours. Datum does it in 15 minutes.

Side-by-side comparison with original PDF

Exact paragraph and line-item citations

Automated audit log for every decision

SUBMITTAL REVIEW

QC CHECK

SUBMITTAL REVIEW

Manually, this takes 4+ hours. Datum does it in 15 minutes.

Side-by-side comparison with original PDF

Exact paragraph and line-item citations

Automated audit log for every decision

Features

Features

Features

Features

Features designed to empower your workflow

Features designed to empower your workflow

Features designed to empower your workflow

Features designed to empower your workflow

Purpose-built tools for architecture firms doing construction administration.

Submittal Review

AI reads your specs, checks every submittal, and writes review comments with exact citations in 15 minutes, not 4 hours.

Team Collaboration

Collaborate with your team. Keep a defensible record of every CA findings.

Seamless integrations

Save time and boost efficiency. Sync and export projects with ease.

Cited Findings

Direct links to exact spec section, drawing sheet, and code.

Review History

Full audit trail of every decision. See who reviewed what, when.

The Problem

Reviewing submittals
shouldn’t take days.

Reviewing submittals
shouldn’t take days.

Every submittal takes hours to review. Violations slip through. Change orders pile up. Your firm loses money on every project.

Every submittal takes hours to review. Violations slip through. Change orders pile up. Your firm loses money on every project.

5-7 hours to compile each submittal

Teams manually compile 200-900 page packages, cross-referencing specs, codes, and product data. This process repeats across dozens of trades.

5-7 hours to compile each submittal

Teams manually compile 200-900 page packages, cross-referencing specs, codes, and product data. This process repeats across dozens of trades.

5-7 hours to compile each submittal

Teams manually compile 200-900 page packages, cross-referencing specs, codes, and product data. This process repeats across dozens of trades.

5-7 hours to compile each submittal

Teams manually compile 200-900 page packages, cross-referencing specs, codes, and product data. This process repeats across dozens of trades.

Manual reviews = Missed code violations

Fire ratings, thermal breaks, and SHGC violations go undetected during manual checks. These errors surface after installation as change orders.

Manual reviews = Missed code violations

Fire ratings, thermal breaks, and SHGC violations go undetected during manual checks. These errors surface after installation as change orders.

Manual reviews = Missed code violations

Fire ratings, thermal breaks, and SHGC violations go undetected during manual checks. These errors surface after installation as change orders.

Manual reviews = Missed code violations

Fire ratings, thermal breaks, and SHGC violations go undetected during manual checks. These errors surface after installation as change orders.

$120K+ wasted annually on resubmittals

With a 35% resubmittal rate, teams waste hundreds of hours on re-reviews and coordination. Each rejected cycle costs $805 and delays projects.

$120K+ wasted annually on resubmittals

With a 35% resubmittal rate, teams waste hundreds of hours on re-reviews and coordination. Each rejected cycle costs $805 and delays projects.

$120K+ wasted annually on resubmittals

With a 35% resubmittal rate, teams waste hundreds of hours on re-reviews and coordination. Each rejected cycle costs $805 and delays projects.

$120K+ wasted annually on resubmittals

With a 35% resubmittal rate, teams waste hundreds of hours on re-reviews and coordination. Each rejected cycle costs $805 and delays projects.

The Future

Powering document intelligence to simplify approvals.

Powering document intelligence to simplify approvals.

Say goodbye to version chaos. Let Datum align submittals, specifications, plans and RFIs in one clean, audible review process.

Say goodbye to version chaos. Let Datum align submittals, specifications, plans and RFIs in one clean, audible review process.

EVIDENCE ENGINE

Reviews with Receipts

Reviews with Receipts

Stay ahead of every deadline with AI that reads your spec, drawings. Catch violations before they become change orders, meet submission windows, and keep your CA workflow moving.

Side-by-side comparison with original PDF

Exact paragraph and line-item citations

Automated audit log for every decision

COMPLIANCE CHECKER

Code checking with evidence.

Submittals are verified against IBC, ASHRAE, and NFPA. Failures come with compliant alternatives.

Checks against yourbuilding standards

Jurisdiction-specific local amendments

One-click remediation suggestions

How it works

DATUM reviews submittals against your specs, drawings, and codes and shows its work. Every issue, every decision, fully traceable.

Upload your documents

Specs, drawings, schedules, and submittals are uploaded.

Upload your documents

Specs, drawings, schedules, and submittals are uploaded.

Upload your documents

Specs, drawings, schedules, and submittals are uploaded.

Upload your documents

Specs, drawings, schedules, and submittals are uploaded.

Automated evidence checks

Specs, codes, drawings, and submittals are cross-checked.

Automated evidence checks

Specs, codes, drawings, and submittals are cross-checked.

Automated evidence checks

Specs, codes, drawings, and submittals are cross-checked.

Automated evidence checks

Specs, codes, drawings, and submittals are cross-checked.

Clear, defensible outcomes

Issues, decisions, comments, and citations are documented.

Clear, defensible outcomes

Issues, decisions, comments, and citations are documented.

Clear, defensible outcomes

Issues, decisions, comments, and citations are documented.

Clear, defensible outcomes

Issues, decisions, comments, and citations are documented.

Issue RFIs with evidence

Findings, evidence, and context are sent forward.

Issue RFIs with evidence

Findings, evidence, and context are sent forward.

Issue RFIs with evidence

Findings, evidence, and context are sent forward.

Issue RFIs with evidence

Findings, evidence, and context are sent forward.

Book a demo

Get in touch with our industry experts today

Let our experienced team help you clarify your next steps.